Bulk fill dirt delivered in Federal Way, WA. Brown color.

Starting from $474.50 delivered to Federal Way for 2 tons, our minimum order

Weight per yard 2200 lb Density 81.5 lb/cu ft

Homeowners often order fill dirt in Federal Way, WA to fix a sloped or uneven yard, build up a planting area, or set a patio base level before stone or pavers go down. Fill dirt delivery in Federal Way is sold by the ton and dropped at your address in bulk. The sections below cover the city and its neighbors, the jobs that suit fill, how to work out tonnage, and the steps to place an order.

Federal Way Yards and Nearby Cities

Federal Way is a city of about 100,000 people in King County, south of Seattle along Interstate 5. Kent is about 7 miles away, Renton about 11 miles, Seattle about 21 miles, Bellevue about 23 miles, and Redmond about 28 miles. Sloped side yards and low back corners come up often in this part of the county, and they are the jobs where a load of fill makes the biggest visible difference.

Best Uses for Fill Dirt in Federal Way

On a sloped lot, fill should be stepped or tapered so it does not slide or send runoff toward a neighbor. A thin edge that ends abruptly will wash out in the first heavy rain. If the work is a surface for parking or a drive rather than a fill job, Asphalt Millings deserves a look before you commit to the order.

Fill Dirt Delivery in Federal Way, WA

Check the route the truck will take from the street before you order. Overhead lines, a tight turn, or a low branch can stop a load before it reaches the spot. Choose a drop point near the work area that will hold the weight of a loaded truck, and avoid ground that turns to mud after a storm. If the only route crosses a lawn, lay boards or a gravel strip so the tracks do not dig in. Spreading is easier on dry ground, so a few dry days before spreading make the work much easier. Details on how orders reach local addresses are on delivery in Federal Way.

Working Out Tonnage in Federal Way

Cubic yards equal length in feet times width in feet times depth in inches, divided by 324. Yards here rarely have square corners, so pace off the length and width in a few places and average the depth instead of using the deepest dip. Jot the dimensions on a rough sketch of the space. Once you have cubic yards, the calculator converts the figure to tons for you.

Each cubic yard of fill dirt weighs roughly 2,200 pounds, so a single ton covers close to nine-tenths of a cubic yard. Fill packs down under foot traffic and rain, and it settles over the first few weeks. Adding a modest extra amount keeps the finished grade where you planned it, and the extra is cheaper than a second small order later.

Pricing Notes

The unit here is the ton, with 2 tons as the smallest order. Type in your Federal Way ZIP and the page shows a delivered rate with the trip already built in. Ordering more tons lowers the rate on each one, so a large regrade is usually cheaper to do in one order than in several small ones.

Ordering Fill Dirt in Federal Way

  1. Choose fill dirt and set the tons, with 2 as the lowest number.
  2. Enter the delivery address and read through the summary.
  3. Finish checkout once you know where the truck will stop and how it gets there.

Fill dirt in other Washington cities is gathered on Fill Dirt in Washington. Pea Gravel and River Rock have their own Federal Way listings.

About Fill Dirt

About this material

Fill dirt is bulk soil sold for building ground up rather than for finishing it. Contractors and homeowners use it when a yard, bed or pad needs to rise to a new height. The material is dense, brown, and chosen for how it sits under other layers, so its performance comes from weight and firmness more than from looks.

Fill dirt is usually covered by something: sod, mulch, a paver base, or a planting mix. It carries little of the organic matter that plants need, which is why it serves as a foundation layer. Orders are measured by the ton, so the weight that arrives on site is the figure that matters when planning a project.

What Fill Dirt costs in Federal Way

Local Federal Way yards quote fill dirt by the ton; the delivered number includes fuel, the truck, and the haul. Send your ZIP and load size and we will send back a same-hour quote with the truck rate and the per-ton figure spelled out. A ton of this material spreads across about 98 sq ft when laid 3 inches deep, useful when you are sizing a patio base or a walkway run.

How crews use Fill Dirt in Federal Way

In and around Federal Way, fill dirt shows up most often on two project types. The most common deployment is erosion control, often in tight urban lots and infill builds in two to three inch lifts. Second on the list is driveway gravel, which we see in dense neighborhoods where curb access is short on partial-truck deliveries. At roughly 100,252 people, the Federal Way order mix leans toward 3 to 8 ton residential drops with the occasional 16 ton job for a contractor.

Delivery day in Federal Way

A typical Federal Way drop is dispatched from the closest yard with a two hour window and a heads-up call once the truck is loaded. Tandem trucks want a 12 ft lane in and out; tri-axles need 14 ft, and both want firm ground at the tipping spot so the load releases cleanly. Standard lead time on this lane is Mon-Sat, with same-day windows held open for orders that hit the desk before 11 AM and clear payment.

SAME CATEGORY

Related materials we deliver in Federal Way

Estimate how much you need

Work out your material

Cubic yards0 cu yds
Approximate weight0 tons

A planning figure, not a guarantee. Order roughly a tenth extra to cover settling and uneven ground.

PRODUCT & CITY HUBS

Browse more

PROJECTS

Common uses for Fill Dirt in Federal Way

NEARBY

Available in nearby cities

TOOLS

Plan your project

KEEP READING

Related guides

Frequently Asked Questions

Can fill dirt fix a yard that holds water?

Fill can raise a low spot so water drains off it, but the finished surface has to fall in the right direction for that to work. Check the fall with a level and a long board once the fill is spread, since a flat top can still hold a puddle.

How deep can I add fill in one pass?

In Federal Way, thin layers settle more evenly than one deep pile. For larger changes in grade, many people place fill in two or three passes and let each one firm up before adding the next. The right depth depends on the finished height you want and the ground underneath.

How many wheelbarrow loads make up a ton?

A ton of fill is roughly 24 cubic feet of loose material. A standard 3 cubic foot wheelbarrow would need about eight full loads to move a ton, and the 2-ton minimum works out to around sixteen. Loads vary with the wheelbarrow and how full each one is.

Can I park a vehicle or trailer on new fill?

Not right away. Fresh fill is loose and a heavy wheel will rut it or sink in. Give the surface time to firm up, and keep vehicles off until it has been rained on and walked over without leaving deep prints. For a parking area, plan on a compacted stone or millings layer on top rather than relying on fill alone.

Is fill dirt the same as compost?

No. Compost is decomposed organic matter used to enrich soil and feed plants. Fill dirt is structural soil meant to build height and bulk. The two do different jobs, and organic matter belongs in the top few inches of a planting bed after the grade is set, not buried underneath it.

Can I use fill dirt to level ground for a play set?

Yes, as a base. Bring the area up to level with fill, firm it, and check it with a long board before anything is anchored. Play sets and swing frames need stable ground, so give the fill extra time to settle and recheck the level before installing, then top the surface with whatever the manufacturer recommends.

Do I need a permit for a large fill job in Federal Way?

The City of Federal Way sets its own rules on grading and fill. Call the permit desk before you order a large volume, especially if the work changes the grade near a property line or a drainage path. Bring a sketch of the area and the finished height so staff can give a clear answer.

How do I check that the finished grade is level?

Run a long straight board across the area with a level on top, then check the ends and the middle. A string line pulled tight between two stakes shows any fall across a longer run and helps you catch high or low spots before the job is finished.

Order Fill Dirt →
0
    0
    Your Cart
    Your cart is emptyReturn to Shop